Obermeyer Helika, winner of the prestigious Office of the Year award in the Renovation of the Year category. The expert jury praised the quality of the workspace at the company's headquarters, located in a former automobile factory—even though it initially struggled with a lack of daylight. Take a look at how we approached this challenge at the U1 lighting studio.
| Project name | Lighting for Obermayer Helika Offices |
| City | Praha |
| Lighting | U1 lighting |
| Architect / Designer | FADW |
| Year | 2026 |
| Photography | Aleš Jungmann, Tomáš Rubín |
| Share this project |
You can find this engineering and construction consultancy in Prague’s Pragovka Art District, an industrial complex with an incredible, unique atmosphere. However, it also came with several drawbacks that naturally stem from its history as a factory.
From an office lighting perspective, the main issue was the lack of natural daylight at the workstations. Yet, in a design and engineering office where people spend hours in front of screens, visual comfort is essential. We resolved this by implementing a combined lighting system, where daylight and artificial light work together simultaneously.
Using a combined lighting system comes with strict regulatory and technical requirements. We had to prevent glare, achieve perfect light uniformity and eliminate unwanted shadows and silhouettes.
Another highlight is the integration of acoustic and lighting solutions through carefully selected fixtures. The project features, for example, the Bell Oval fixture by Polish manufacturer flexxica and the BuzziShade fixture by Belgian manufacturer BuzziSpace. In addition to excellent light rendering, both offer outstanding sound-insulating properties, contributing to the acoustic comfort.
I want to implement a similar project.